Reduce Industrial Downtime
Reduce Downtime Caused by Control System Failures
Unplanned downtime is one of the biggest cost drivers in industrial operations. In many cases, the root cause is not mechanical failure but ageing or poorly designed control systems. PLC failures, obsolete control panels, and unclear automation software can turn minor faults into extended production stoppages.
​
Stratos Control Systems helps industrial sites reduce downtime by improving the reliability, structure, and visibility of their control systems.
Why Control Systems Are a Major Cause of Downtime
As control systems age, they become harder to maintain and more prone to failure. Obsolete PLC hardware, undocumented software changes, and control panels built without clear standards make fault finding slow and unpredictable.
​
When failures occur, maintenance teams are often forced to rely on external engineers or trial-and-error troubleshooting, extending downtime well beyond what should be necessary.
Common Control System Downtime Issues
Industrial downtime is frequently linked to the following control system problems:
​
-
Obsolete or unsupported PLC hardware
-
Control panels built without consistent wiring or labelling standards
-
Poor diagnostics and ineffective alarm handling
-
PLC software changes made without version control or documentation
-
Limited system visibility and no historical fault data
Control System Risk & Lifecycle Assessment

We conduct detailed assessments of existing automation infrastructure to identify vulnerabilities and prioritise investment.
​
Our structured reviews provide clear visibility of system condition, supportability, and long-term viability.
-
Identification of obsolete, unsupported, and high-risk systems
-
Assessment of asset lifecycle and vendor support status
-
Prioritised upgrade and replacement planning
-
Clear recommendations aligned to business objectives
How We Reduce Control System Downtime

Stratos Control Systems takes a structured, engineering-led approach to reducing downtime:​​
​
-
Control panel redesign and rebuild using AutoCAD or E-Plan
-
PLC, HMI, and SCADA upgrades aligned to modern standards
-
Improved alarm handling, diagnostics, and fault visibility
-
Structured testing, commissioning, and validation
-
Clear documentation to support ongoing maintenance
​
Our focus is not just fixing failures, but preventing repeat downtime events.
Who This Is For?
This solution is typically used by:
​
- Maintenance Managers responsible for uptime and response times
-
Engineering Managers managing ageing control systems
-
Operations teams experiencing frequent or unexplained downtime

Reduce downtime at my site
Whether you’re planning system upgrades, reducing downtime, or improving long-term reliability, speak to our engineers today for practical, site-specific solutions you can rely on.