How to Choose a Control Panel Manufacturer (UK Guide for Industrial Buyers)

What separates a good control panel manufacturer from a poor one: the standards they build to, the documentation they issue, and what happens in year five.

9 March 2026

Control panel with several PLCs and servo drives, ferruled and labelled, ready for test

Two control panels can meet the same specification and be nothing alike to live with. The difference turns up later: how fast a fault is traced, whether a spare drops straight in, whether the drawings still describe what is actually in the enclosure. Choosing a control panel manufacturer is the decision that sets all three.

What a control panel manufacturer does

Design, build, test. The assemblies are PLC control panels, process control panels, and the panels sitting behind machine control and SCADA and HMI systems. The work runs from the schematic through component selection, enclosure preparation, wiring and identification, to testing before anything leaves the works.

A panel builder assembles from drawings somebody else produced. A control panel manufacturer owns the design too. That distinction stops being academic the first time a drawing is wrong, or a specified part has gone obsolete between quotation and build.

The standards a control panel is built to

Three standards do most of the work on UK control panels.

StandardWhat it governsWhat to ask
BS EN 61439Low-voltage switchgear and controlgear assemblies: temperature rise, short-circuit withstand, dielectric properties, degree of protectionHas the design been verified, and to what short-circuit withstand rating in kA
BS EN 60204-1Electrical equipment of machinery: emergency stop, isolation, protective bonding, wiring methodsWho owns the machinery safety functions, you or them
Older control panel with an orange backplate during refurbishment

What to check before choosing a control panel manufacturer

Almost everything that separates control panel manufacturers is decided before anyone picks up a crimp tool.

What to checkWhy it matters
Experience with the platform you runSiemens, Allen-Bradley and Mitsubishi behave differently. Someone who has only worked on one will carry assumptions into the others.
Design and layoutComponent spacing, access to terminals, segregation of power and control, and space left for the additions that always come later.
Documentation issued with the panelSchematics, panel layouts, terminal plans, I/O schedules, test records, and as-built drawings that match what was actually built.
Component selectionObsolescence risk and spares availability beat unit price. A cheaper contactor nobody stocks in three years was not cheaper.
Testing before deliveryDead testing, live testing, I/O testing against the schedule, and a Factory Acceptance Test you are invited to attend.
IntegrationWhether the same people write the PLC software and commission it, or whether you coordinate two suppliers across one fault.
Support afterwardsWho answers the phone, how quickly somebody attends, and whether they still hold your backups.

New control panel or refurbishment

Not every project needs a new control panel. An enclosure in sound condition, with room to work in, is often worth keeping. The money goes further on what is inside it.

New buildRefurbishment
Best forNew plant, or a panel with no space, degraded wiring or no usable drawingsSound enclosure, obsolete components, a layout that can be improved
DowntimeBuilt and tested off site, then swapped during a planned shutdownUsually staged, and it needs more time on site
DocumentationDrawn from scratch, so the drawings match the panelA chance to re-document a system nobody has accurate drawings for

Control panel documentation is the part people regret

Nobody can safely modify a panel with no drawings. The pack should carry electrical schematics, panel layout drawings, terminal plans, cable schedules, I/O schedules, component schedules, test and inspection records, and as-built drawings updated for every change made during the build. Then ask the question that actually decides whether any of it stays true: who updates the drawings when something changes on site. That is where the record and the panel usually start to drift apart, and it is why we run EPLAN control panel design as its own discipline rather than a step at the end.

Ask a control panel manufacturer what happens in year five

Can they still get the parts. Do they hold a verified backup of the PLC and HMI software, and have they ever restored one. How quickly does somebody attend, and is that a written commitment or a hope.

A manufacturer who also does PLC programming, fault finding and support contracts is answering a different question from one who builds the panel and hands over the keys.

Frequently asked questions

What should I look for in a control panel manufacturer?

Experience on the platform you actually run, design and layout you can maintain, a documentation pack that matches the built panel, component choices made on obsolescence rather than unit price, testing you are invited to witness, and a clear answer on who attends when it fails.

What standards should control panels meet in the UK?

BS EN 61439 covers low-voltage assemblies, including temperature rise, short-circuit withstand and degree of protection. BS EN 60204-1 covers the electrical equipment of machinery. Ask which apply to your panel and who is responsible for the machinery safety functions.

How much does a control panel cost?

It depends on the enclosure, the component count, the I/O and the testing regime, so settle the specification before the quotation rather than discovering it afterwards.

Can control panels be upgraded instead of replaced?

Often, yes. An enclosure in sound condition with space to work in is worth keeping, and refurbishment can replace obsolete components, improve the layout and re-document a system nobody has accurate drawings for. A new panel makes more sense where there is no space, the wiring has degraded, or the drawings are gone.

Why is documentation important in control panel design?

Nobody can safely modify a panel with no drawings. The pack should carry schematics, panel layouts, terminal plans, cable schedules, I/O schedules, component schedules, test records and as-built drawings. The question that decides whether it stays accurate is who updates it when something changes on site.

Ready to talk through your automation challenge?

Tell us what the system needs to do, or what it is doing that it should not. You will speak to an engineer, not an account manager.