Good control panel design is judged on a day nobody plans for: the day somebody who did not build it has to find a fault in it, quickly, with the line down.
What industrial control panel design covers
It runs from the electrical schematic through component selection, panel layout, wiring and terminal design, to integration with the PLC and SCADA and HMI systems the panel serves. Drawn in EPLAN Electric P8 or AutoCAD Electrical, the design is also the document the panel is built from, tested against and maintained with for the rest of its life.
Good against poor control panel design
| Good design | Poor design | |
|---|---|---|
| Layout | Related components grouped, consistent conventions, space to work | Filled to capacity, arranged around whatever fitted |
| Separation | Power and control segregated, voltage levels zoned | Mains and extra-low-voltage in the same trunk |
| Identification | Wire numbers, terminal numbers and component tags matching the drawings | Partial labelling, inconsistent naming, nothing tying panel to schematic |
| Cable management | Routed, contained, room for the next change | Loose bundles, insulation chafing where nobody looks |
| Documentation | Schematics, I/O lists, terminal plans and component schedules issued as-built | A drawing set that describes the panel as it was first delivered |
| Expansion | Spare terminals, spare I/O, physical space left deliberately | No room, so the next addition goes wherever it fits |
The standards behind control panel design
BS EN 61439 governs the assembly: temperature rise, short-circuit withstand, dielectric properties and degree of protection. BS EN 60204-1 covers the electrical equipment of machinery, including emergency stop, isolation and protective bonding. Between them they set most of what a design has to answer for.
Designing for the environment
Ingress protection is a design decision, not a catalogue choice. IP54 suits an indoor plant room. A washdown area in food or beverage production needs IP65 or IP66 and a stainless enclosure, with sloped tops and no crevices that trap water. Thermal calculations belong here too, because drives, transformers and power supplies all put heat into the enclosure and the ambient temperature of a plant room in August is not the one on the datasheet.
New panel design or improving an existing one
New build allows a layout drawn for the system rather than inherited from it, and drawings that match the panel from day one. Refurbishment keeps a sound enclosure and spends the money on what is inside: obsolete components replaced, layout improved, wiring re-run and identified. Where drawings have been lost, re-documenting the panel is usually the first job worth doing, because every subsequent intervention depends on it.
What it is worth
Layout and labelling decide how long fault finding takes, every time, for fifteen years. That is the return on control panel design, and it is why we treat the drawing set as the deliverable rather than the paperwork. Our control panel design and build work is organised on that basis.